On November 4, 2010, a legal report was issued regarding the Entitat Urbanística Col·laboradora de Conservació (EUCC) Les Planes del Rei and the situation of the urbanisation Planas del Rey (Planes del Rei) in Pratdip. This article provides an analytical restructuring: context, key points, practical consequences and lines of action for property owners.


1) Nature of the document

  • Type: note / analytical legal report.
  • Purpose: status, role and scope of the acts of the EUCC Les Planes del Rei in relation to the municipal obligations of the Pratdip Town Hall.
  • Scope: minimum public services, management of the urbanisation, billing of water and waste, respective responsibilities of EUCC / town hall.
  • Area: Planas del Rey (Planes del Rei), municipality of Pratdip.

2) Context and references

  • EUCC: entity for conservation and maintenance under urban planning law, with statutes and management bodies.
  • Pratdip Town Hall: obliged to guarantee minimum public services and, eventually, to proceed with the reception of the urbanisation when conditions are met.
  • Recurring tensions: overlapping roles, contestation of charges imposed on owners, difficulties regarding water and waste, uncertainty about the scope of the EUCC’s acts.

3) Key points of the analysis

  • Municipal obligations: the town hall cannot delegate the guarantee of minimum public services to a private entity such as the EUCC.
  • Acts of the EUCC: their legitimacy and scope are fragile when they replace missions normally belonging to the public authority.
  • Water & waste: billing and collection are a major friction point, with a risk of double taxation or undue transfer of costs to property owners.
  • Legal certainty: maintaining an ambiguous regime (shared or poorly defined competences) generates insecurity for residents and exposes the town hall to legal challenges.

4) Recurring legal issues

  • Contradiction of roles: the EUCC cannot indefinitely serve as an institutional alibi to postpone municipal intervention.
  • Transfer of costs: the fees and services imposed on property owners by the EUCC are contestable when they replace public obligations.
  • Reception of the urbanisation: clarification of the conditions (technical, legal, financial) remains essential to end the uncertainty.

5) Practical consequences for property owners

  • Uncertainty about the scope of EUCC acts and the financial deadlines requested.
  • Water & waste: potential disputes regarding the legal basis of billing and collection.
  • Double payment: risk of paying both local taxes and private fees for services of a public nature.
  • Insecurity of residents’ rights in case of non-execution of minimum services (lighting, water, roads, sanitation, etc.).

6) Lines of action and recommendations

  • Targeted contestation of fees and calls for funds from the EUCC when they replace public obligations.
  • Formal requests to the town hall for the execution of minimum services and the clarification of responsibilities.
  • Legal avenues: administrative and contentious appeals aimed at recording failures and obtaining enforcement measures.
  • Path towards reception: plan a timeline accompanied by a technical audit (infrastructure) and a transparent financial scheme.
  • Transparency: regular publication of key information (costs, contracts, decisions) to restore trust among property owners.

7) Summary

The November 2010 report highlights a structural weakness: the EUCC cannot permanently replace the obligations incumbent on the town hall. As long as competences remain unclear and charges unfounded, disputes will persist. A strategy combining legal clarification, service requirements and a reception plan is necessary.